PoolsKSA pool company
  1. Home
  2. Pool Construction

Our services

Pool Construction in Riyadh & Saudi Arabia

From design and excavation to your first swim. Choose the system that suits your space and budget, built under engineering supervision with a clear quote.

How it works

  1. Contact us

    WhatsApp us or fill in the form and tell us what you need.

  2. Free site visit

    We visit and our engineer inspects the site and sets priorities.

  3. Quote & schedule

    You get an itemised quote and a clear timeline.

  4. Build & handover

    We deliver under engineering supervision and hand over with the warranty.

How a concrete pool is built, stage by stage

Decisions to lock in before digging

Some pool decisions can change later. Others are cast into the concrete and stay. The trick is knowing which is which and settling the second group before a machine enters the site.

  • The system, skimmer, overflow or infinity, since it shapes the top of the wall and whether there is a channel and balance tank.
  • Depths, and where one depth changes to the next.
  • Step shape and position, and whether there is a seating ledge in the water.
  • Plant room position and its distance from the pool.
  • Wall light positions.
  • Any future jacuzzi or waterfall, whose pipe routes must be reserved now.
  • An automatic cover, as some types need a recess in the edge.

Mosaic colour, coping stone and lighting effects can wait for the finishing stage. If you have not chosen a system yet, compare skimmer, overflow and infinity pools first. For villas, villa pool design explains how we tie the pool to the house and garden.

Reading the site and the ground

What lies under the pool decides half the job, and the same design can be built two different ways depending on what we find.

  • Rock. Stable and excellent for a pool, but slower to dig and in need of breaking equipment.
  • Sand. Easy to dig but the sides slump quickly, so it needs temporary support and careful sequencing.
  • Fill. Many gardens hold loose fill left from building the villa. Uncompacted fill cannot carry a pool directly and has to be treated or removed.
  • Shallow groundwater. It presses on the shell from outside and can even lift an empty pool. It calls for external waterproofing and closer study, and is common in parts of the Eastern Province.

We also check the distance to the neighbour's wall and to the villa foundations, since digging near an existing footing needs care and shoring. And we check the access. A narrow gate or a set of steps means smaller machines or some hand digging. More on our excavation and structural works page.

Excavation, steel and the concrete pour

The hole is dug larger than the finished pool, with room for the walls and for external waterproofing if needed. A blinding layer goes on the floor, then the steel for floor and walls is fixed.

Before the pour, the engineer checks the steel for bar size, spacing and concrete cover, and confirms every opening for pipes, lights and skimmers is in place. An opening forgotten now means cutting into fresh concrete later.

The pour itself needs planning. Concrete should arrive, be placed and be vibrated as continuously as possible, because unplanned joints between pours become likely leak points. In summer heat we take curing seriously, keeping the concrete wet and covered in the first days so it does not dry too fast and crack.

No homeowner sees this stage after handover, yet it decides whether the pool runs trouble free for many years.

Pipework, balance tank and plant room

A pool has a network of pipes that draws water to the filter and returns it clean. In a skimmer pool, suction comes from the skimmer openings and floor drains. In overflow and infinity pools, water spills into a channel, drops into the balance tank and goes from there to the filter.

The balance tank has to be sized correctly, because it takes the water displaced when people get in. Too small and it overflows. Too large and you pay for capacity you never use.

All pipework is pressure tested before it is buried. We hold it under pressure for a period and watch the gauge. Any drop means a joint that must be fixed now, while it is still exposed.

The plant room needs ventilation, a floor drain and space to work. It should sit close to the pool so pipe runs stay short, but away from bedrooms because pumps make noise. Equipment choices are covered on filtration, sanitation and heating.

Waterproofing and the fill test

Concrete alone does not hold water. Waterproofing does. We apply it over the whole inner surface, the channel and the balance tank, with extra care at the weak points around pipes, lights and skimmers, in corners and at the steps.

Where the ground holds groundwater or heavy moisture, we add external waterproofing to the walls before backfilling. That protects the concrete and steel from moisture rising from the soil.

After waterproofing and before tiling, we run a fill test. The pool is filled, left for a period and the level is watched. If it holds, tiling begins. If it drops, we find the cause and fix it while the surface is still open. That one step can save you breaking out brand new tiles later.

Finishes, copings and the pool deck

Once the waterproofing has settled, cladding begins, and your choice here changes the look of the water itself. Light colours give clear, bright blue water. Dark colours give deeper, calmer water that also warms faster in the sun.

Copings work harder than any other part of the pool. They take sun, water, chemicals and people sitting and climbing out. We choose stone or tile that holds up, grips underfoot and does not get too hot at midday. On overflow and infinity pools, the precision of the edge level matters most, because any tilt shows in the way the water spills.

The deck is part of the design, not an afterthought. It needs falls that carry splash water away from both the pool and the house. See pool tiling and finishing.

Lighting and electrics during construction

Lighting is decided before the pour, because wall lights need niches and sleeves cast into the concrete. We set their number and position by the length and shape of the pool, aiming for a floor that is evenly lit at night with no dark patches and no glare in the eyes of people sitting nearby.

Pool electrics follow firm rules. Low voltage in the water, proper earthing, a dedicated panel with protective breakers, and a location away from splashing. We also lay spare conduits if you may want smart control or garden lighting later. Details are on pool lighting and electrical.

First start up and handover

When tiling is done and the grout has cured, we fill the pool and start the equipment. The first days of running need attention. We set pH and chlorine and watch the water until it settles, and we check every joint in the plant room while the system is running.

At handover we go through a clear list with you.

  1. Running the pump and filter, and how to backwash.
  2. The control panel and run times.
  3. The lights and how to control them.
  4. The sanitation unit and how to adjust it.
  5. Target water values, such as pH between 7.2 and 7.6, the usual range for home pools.
  6. The written warranty on workmanship and waterproofing.

The project timeline is written into a schedule that comes with the quote. If you would rather someone else looks after the pool once it is running, see cleaning and maintenance.

Villas, palaces, farms and rooftops

The stages are the same for every pool, but each type of project has its own pressure point.

  • Villas. Space is usually tight, and the challenge is balancing the pool with seating, paths and the nearby foundations.
  • Palaces. Larger pools, often overflow or infinity with a jacuzzi and waterfall. Coordination with the architect and landscape designer matters from the start.
  • Farms. Generous space and family pools with a children's area. The challenge is power and water supply and simple upkeep, as the site is far from town.
  • Rooftops. The first question is structural. Can the slab carry the weight of water and concrete? That needs a study before any design.

We build in every region of the Kingdom, and local conditions change details such as waterproofing and equipment choice. See service areas, or pools across Riyadh if your project is in the capital.

FAQ

Do I need to clear the whole garden during construction?
We need room to dig, space to store materials and a path for the machine. We agree site boundaries with you before starting and protect the areas we are not working in.
Where does the excavated soil go?
Spoil removal is a clear line in the quote. Sometimes part of the clean soil can be used to level the garden if you want.
Can I follow the work when I am away?
Yes. We send photos of each stage on WhatsApp, especially the stages that get buried, such as steel, pipework and waterproofing.
Why run a fill test before tiling?
To confirm the waterproofing and pipework are sound while the surface is still open. A leak found after tiling is harder and costlier to fix.
What if you hit rock or water while digging?
We stop, explain the situation, the proposed solution and its effect on the quote before continuing. The site study at the visit reduces the chance of surprises.
How much space do I need for a villa pool?
We can design a small pool from about 3 × 6 m; the key is leaving space around it. We confirm after the site visit.
Skimmer vs overflow?
In a skimmer pool water sits below the edge and costs less; in an overflow pool water reaches the edge into a channel and balance tank for a more luxurious look.
Why does the balance tank matter?
It receives overflow water and keeps the level stable. If it is undersized or poorly waterproofed you get water loss or leaks.
Does an infinity pool suit every villa?
It looks best with a view or level change, but we can design a visual effect even on flat plots. We advise after the site visit.
How long does pool construction take?
Usually 6 to 10 weeks for a concrete pool depending on size, system and finishes. You get a clear timeline with the quote.
What is the best pool finish?
Glass mosaic lasts longest with stable colour; porcelain costs less. The key is pool-rated adhesive and grout.
How much does a pool cost?
It depends on size, depth, system (skimmer, overflow or infinity), finish level and extras. That is why we offer a free site visit and an itemised quote.
Is the site visit really free?
Yes. The site visit and quote are free in Riyadh with no obligation. In other cities we arrange the visit with you and explain the details when you contact us.

Free site visit

Request a free quote

Fill in your details and WhatsApp opens with a ready message to our team to arrange your site visit.

We keep your details only to follow up on your request and never share them. Privacy policy