- Home
- Pool Construction
- Pool Waterproofing
Our services
Pool Waterproofing in Riyadh, Inside and Out
Concrete alone does not hold water. We waterproof the shell inside before tiling, add an outer layer where the ground is damp or groundwater is close, and nothing gets covered until the pool passes a fill test.
Pool waterproofing that stops leaks at the source
Need a new pool sealed before tiling, or an older pool that keeps losing water? We waterproof the shell from inside, directly on the concrete under the tile adhesive, and add an external layer under the floor and around the walls where the soil is damp or groundwater is close. Nothing is covered until the pool passes a fill test.
On a new build the membrane follows our pool excavation and structural works and comes before pool tiling. On an existing pool we locate the leak first, using bucket, dye and pipe pressure tests, then decide between a local repair and full waterproofing as part of pool renovation. The same approach applies in Riyadh, the Eastern Province and the rest of the Kingdom. Send photos and your location on WhatsApp to arrange a visit.
What is included
- Leak detection for existing pools
- Surface preparation, crack and corner repair
- Internal membrane under the tiles
- External waterproofing for walls and floor in wet ground
- Sealing pipes, light niches and skimmers
- Fill test before tiling


Why PoolsKSA
Engineer-supervised
An engineer oversees every stage from site visit to handover.
Site visit and report
We visit, inspect and give you a condition report with no obligation.
Clear quote
An itemised quote with no hidden costs or later surprises.
Workmanship warranty
A real warranty on workmanship and finishes.
On schedule
A clear timeline and handover on the agreed date.
After-handover support
Our team stays with you after handover for any issue or maintenance.
A working guide to pool waterproofing, from shell to fill test
When pool waterproofing happens
Waterproofing belongs to the structure, not the finishes. It goes on after the reinforced concrete shell has been poured and cured, and before the first tile is laid. Get that order wrong, or squeeze the time between steps, and you end up with a pool that looks perfect and loses water in its first season.
Many owners assume tiles keep the water in. The tiles themselves absorb very little, but the grout joints between them let water through over time, and tile adhesive is not a waterproof layer. What actually holds the water is a continuous membrane on the face of the concrete, under the adhesive. That membrane is what this page is about.
On a new concrete pool build the sequence is simple. Excavation, rebar, pour and curing happen during our excavation and structural works. Then the surface is prepared and waterproofed. Then the pool is filled and tested. Only when it passes do we move on to tiling and finishing. On an existing pool that leaks, waterproofing is part of pool renovation, after the old finish is stripped back to sound concrete.
Fresh concrete is not ready for a membrane on day one. Most systems need concrete that has cured properly and a clean, firm surface, and the engineer decides when it is ready based on the mix and the weather. In a Riyadh summer we watch this closely, because heat dries the surface fast and fine shrinkage cracks have to be treated before any coat goes on.
Inside and outside waterproofing
A concrete pool takes water pressure from two directions. From inside, the pool water pushes on the floor and walls all the time. From outside, damp soil and sometimes groundwater push back toward the shell. Each side needs its own protection, and as a general rule a membrane works best on the face that receives the pressure.
Internal waterproofing
Every pool we build has it, from a compact villa pool to a large farm pool. The membrane covers the inner face of the floor, walls, steps and benches, and runs up to the top of the wall beneath the coping. It stops pool water reaching the concrete, the rebar and the soil, and it has to be compatible with the tile adhesive that bonds directly to it.
The process follows the same steps each time. We remove formwork residue and tie wire, and repair honeycombing and small voids. The sharp corner between floor and wall is filled with a rounded repair mortar fillet, because sharp corners concentrate stress and membranes crack there. Corners and joints get reinforcing tape or mesh bedded into the coating. Every pipe, light niche and skimmer body gets its own detail. Only then do the full coats go on, at the thickness the product requires, each one allowed to cure before the next.
External waterproofing
External waterproofing sits on the face that touches the soil. It is applied during construction, after the formwork comes off and before backfilling. On wet sites it starts under the floor a membrane is laid over the blinding concrete before the structural slab is poured, then lapped into the membrane on the outside of the walls. A protection board goes over it so backfill and stones cannot puncture it.
Not every pool needs it. On dry ground with a deep water table, a good internal system on sound concrete is usually enough. Where the soil is damp or salty, or groundwater is close, the external layer becomes essential. That call is made from the site visit and soil information, not from habit. And it has to be made early, because once the pool is backfilled and decked the outside face can only be reached by digging all the way around it.
Groundwater in the Eastern Province and other wet sites
In much of the Eastern Province, including Dammam, Al Khobar, Al Ahsa and Jubail, groundwater can sit close to the surface. Some coastal plots are on sabkha, a salt flat soil. That water carries salts that attack concrete and steel if they reach them, and it presses on the shell from the sides and from below.
On a site like that the whole method changes
- Pumps keep the excavation dry through the pour and the waterproofing, until the shell is ready to backfill.
- The floor and outer walls are waterproofed as one continuous system, rather than relying on the internal membrane alone.
- The engineer selects a concrete mix suited to saline ground and sets enough concrete cover over the steel.
- The floor is designed to resist uplift. Some designs add a hydrostatic relief valve in the floor, at the engineer's discretion.
- Construction joints get a waterstop, because they are the first place seepage finds.
There is a risk many owners do not know about. An empty pool in ground with a high water table can lift or crack its floor under the upward pressure. So we never drain a pool on such a site without assessing it first, and if it must be emptied for repair we lower the water level around it beforehand.
It is not only an Eastern Province issue. Jeddah and the west coast have high humidity and salty air, and parts of Riyadh have seen rising groundwater. Heavily irrigated farms keep the soil around a pool wet for most of the year. We work across every region of the Kingdom and choose the system for the site in front of us.
Waterproofing material families
There are many products and even more brand names, so it is easier to think in families. Each one has a job it does well and places it should not go.
| Family | What it does | Where it goes | Watch for |
|---|---|---|---|
| Two part flexible cementitious | Thin flexible coating bonded to concrete | Inside, under tiles, in most pools | Needs a sound surface and at least two coats |
| Crystalline | Penetrates and blocks the pores of the concrete | Support for the concrete itself, works even with pressure from the other side | Does not bridge moving cracks or joints |
| Liquid polyurethane | Seamless, highly elastic membrane | Copings, joints and areas that move | Must be rated for immersion and compatible with the adhesive |
| Epoxy | Hard, chemical resistant layer | Some final coatings and epoxy grout | Rigid, cannot follow movement |
| Bituminous sheet or liquid | Thick barrier against soil moisture | Outside buried walls and under the slab | Not for use inside the pool under tiles |
| Injection resins | Fill a crack from within, some expand on contact with water | Stopping an active leak at a known crack | A local repair, not a replacement for a full membrane |
We rarely rely on a single product. A new pool on dry ground is usually well served by a flexible cementitious membrane with reinforced corners. A pool in groundwater gets external protection plus crystalline treatment and a flexible membrane inside. Copings and overflow channels get a more elastic material. Ordinary roof waterproofing is a common mistake some of it is excellent on a roof but cannot handle permanent immersion, chlorine, or tile adhesive on top. Whatever goes into a pool should be specified by its maker for submerged tanks.
Pipes, lights, copings and balance tanks
A well built wall rarely leaks through its middle. Water finds the places where the concrete is interrupted or two materials meet, and each of those gets its own detail before the general coats.
- Pipes through the wall are cast in with a sleeve and a water seal collar, and the membrane wraps onto them.
- Light niches and their cable conduits are sealed together. An unsealed conduit can carry water all the way to the electrical panel. More on our pool lighting page.
- Skimmer bodies in a skimmer pool are plastic set into concrete and move differently, so they get a flexible sealant first.
- The membrane runs up under the coping and over it, and the joint between coping and deck is filled with a flexible sealant.
- The channel and balance tank of an overflow pool or infinity pool are always full and leak silently because nobody sees them, so they are waterproofed and tested to the same standard as the pool.
- Every jet and spout for a jacuzzi or waterfall is one more opening to seal.
Rooftop pools and pools over basements need two layers of protection, one for the pool and one for the slab beneath, plus drainage around the pool, because any leak lands straight in the rooms below.
Finding a leak in an existing pool
If an existing pool is losing water, the first step is not a new membrane. It is proving there is a leak and finding where it is. Re-waterproofing the whole shell does nothing for a cracked pipe under the deck. Leak finding is part of our maintenance and renovation services, and this is the order we work in
- Separate evaporation from leakage. A bucket sits on a pool step, filled to the same level as the pool, and both levels are marked. After a full day we compare. If the pool has dropped clearly more than the bucket, there is a leak. Summer evaporation in Riyadh is high, and many owners mistake it for one.
- Compare pump on and pump off. Loss that increases while the pump runs usually points to the pressure side of the plumbing. Loss that increases with the pump off can point to the suction side. Equal loss either way points to the shell or a fitting.
- Watch where the level stops. If the pool is left to drop and settles at a certain height, the leak is usually at that height, often a skimmer, a light or a crack.
- Dye test. With the pump off and the water still, dye is released next to a suspect crack or fitting. If it is drawn in, that is the leak.
- Pressure test the pipes. Each line is plugged at both ends and pressurised. A falling gauge means a leak in that line. Acoustic listening equipment can then pinpoint it under the deck before anything is broken out.
- Check the plant room pump seals, filter unions and valves. This is the easiest case to fix.
Signs outside the pool help too damp or white salt marks on a nearby wall, soft ground or unusually green grass beside the pool in mid summer, paving that has started to sink, or a water bill that climbs while an auto fill keeps topping up. Photograph anything like that and send it with photos of the pool.
Once the source is known, the repair follows from it. A pipe leak means digging at that exact spot. A fitting is resealed. An active crack can often be stopped by injection. If the membrane has failed over a large area, or tiles sound hollow in many places, the honest fix is to strip the finish and waterproof again from the concrete.
The fill test before tiling
We do not tile a pool that has not passed a fill test. That applies to every new pool and every renovation with a new membrane. Once the membrane has cured to the maker's instructions, the pool is filled to its working level or slightly above.
The level is marked and logged with the time, with an evaporation bucket beside it so normal loss can be told apart from a leak. How long the test runs depends on the pool size, the product and the weather; what matters is that it runs long enough to expose any weak point. During the test we walk around the pool and check the soil, nearby walls and the plant room.
Pipes get their own pressure test before the pour and before backfilling. Balance tanks and overflow channels are filled and watched as well, because a pool that passes says nothing about the tank next to it.
If the level falls beyond evaporation, we drain, find the point, repair it while the membrane is still exposed, and test again. At this stage the repair is straightforward. After tiling, the same leak means breaking out mosaic, re-waterproofing and tiling again. You are welcome to attend the test or ask for photos, and you should ask for one from whoever builds your pool. We also send photos of each stage before it is covered the prepared surface, the reinforced corners, the coats and the test. Years later those photos are your record for any repair or warranty question.
What a waterproofing quote should spell out
When comparing quotes, do not compare only the bottom line. Waterproofing written as one line with no detail is impossible to hold anyone to later. A proper quote names
- The material family for each area floor and walls, copings and joints.
- The number of coats, with thickness to the product data sheet.
- Every surface covered floor, walls, steps, benches, under the coping, overflow channel and balance tank.
- Surface preparation crack and honeycomb repair, rounded corners, reinforced joints.
- Details for pipes, lights and skimmers.
- External waterproofing and its protection layer, where the site needs it.
- The fill test, and who pays for repair and retesting if it fails.
- The warranty on workmanship and waterproofing, written into the contract.
Cost moves with the pool area and the number of steps and benches, the condition of the concrete and how much repair it needs first, the number of fittings and the pool system, any need for external waterproofing or dewatering, and on renovations the removal of old tiles and debris. Two pools of the same size can need very different amounts of work, which is why the price follows the visit. General questions on cost, visits and warranty are answered on our pool FAQ.
After handover, keep pH in the usual 7.2 to 7.6 range, because acidic water eats grout and then the layers beneath it. Do not leave the pool empty in the sun, and do not drill into the pool wall without checking with us, since every hole cuts the membrane. A maintenance contract covers cleaning, water balance and equipment checks, and a regular visitor notices a falling level early. If you are considering salt chlorination, tell us at the start so materials and metal fittings are chosen for it; see filtration and sanitation.
To start, send photos of the pool or the site and your location on WhatsApp. For an existing pool, include the water level at the edge, the plant room and any crack or damp patch you have noticed. Visits are free inside Riyadh, and in other cities we arrange them with you. You then receive a written, itemised quote. You can read why owners trust us or go straight to the contact page.
FAQ
Can a pool be waterproofed from outside after it has been backfilled?
Will a waterproof paint over the tiles stop a leak?
How long does the fill test take?
Do you waterproof pools built by another contractor?
Should I drain my pool before you inspect it?
Should a pool be waterproofed before or after tiling?
How much does a pool cost?
Is the site visit really free?
Do you offer a warranty?
Site visit and quote
Request a quote for your pool
Fill in your details and WhatsApp opens with a ready message to our team to arrange your site visit.


